SEG Warehouse

FastFrames by SEG Warehouse

Build Sheets

Choose a footprint, then pick the height you need.

Current build sheet

8' × 8' × 6' H

Sheet ID 8x8x6 matches the ID printed on your crate or QR code.

Frame

4′4′4′4′6′ RT2008′ per side6′1243

Swipe the drawing to see the full side.

8′ per side6′ high1 mid post per side

Parts key

Corner connector: HW-RT200-C3W
1 Corner connectorHW-RT200-C3W · ×83-way corner piece
Straight splice: HW-RT200-S180
2 Straight spliceHW-RT200-S180 · ×8joins two RT200 tubes
Bottom support connection: HW-1420-0250-BH + HW-1420-BN · ×4
3 Bottom support connectionHW-1420-0250-BH + HW-1420-BN · ×4locks each mid post to the bottom rail
Tube adapter + mid post: RT150-67 ×4 · HW-RT150-TA ×8
4 Tube adapter + mid postRT150-67 ×4 · HW-RT150-TA ×8RT150 post with threaded tube adapters
RT200-454′ RT200RT150-676′ RT150 mid post

Need larger views? Open the connection pictures sheet.

Parts per frame

SKUDescriptionQty
HW-1420-0075-EB¼"-20 Eyebolt .75" Long4
HW-1420-0125-TS¼"-20 Thumb Screw 1.25" Long32
HW-1420-0150-FH¼"-20 Flat Head Screw 1.50" Long16
HW-1420-0250-BH¼"-20 Button Head Screw 2.50" Long4
HW-1420-0250-EB¼"-20 Eyebolt 2.50" Long4
HW-1420-BN¼"-20 Threaded Barrel Nut48
HW-RT150-TA1.50" Tube to 2.00" Tube Threaded Adapter8
HW-RT200-C3W2" Round Tube 3-way Corner Connector8
HW-RT200-S1802" Round Tube Straight Splicer8
RT150-67Aluminum Round Tube 67" Long4
RT200-452" Aluminum Round Tube 45" Long16
RT200-692" Aluminum Round Tube 69" Long4
Build order
  1. Build the top frame.
  2. Build the bottom frame.
  3. Add the vertical RT200 pieces.
  4. Add the RT150 mid posts.
  5. Square the frame and tighten every connection.
  6. Add graphics.
Rig and hang per venue requirements. Weight limits and rigging hardware are job-specific. Need replacement parts or graphics? Use the FastFrames planner.