Current build sheet
19' × 19' × 5' H
Frame
Swipe the drawing to see the full side.
19′ per side5′ high3 mid posts per side
Parts key




RT200-454′ RT200RT200-575′ RT200RT150-555′ RT150 mid post
Need larger views? Open the connection pictures sheet.
Parts per frame
SKUDescriptionQty
HW-1420-0075-EB¼"-20 Eyebolt .75" Long4
HW-1420-0125-TS¼"-20 Thumb Screw 1.25" Long64
HW-1420-0150-FH¼"-20 Flat Head Screw 1.50" Long32
HW-1420-0250-BH¼"-20 Button Head Screw 2.50" Long12
HW-1420-0250-EB¼"-20 Eyebolt 2.50" Long12
HW-1420-BN¼"-20 Threaded Barrel Nut96
HW-RT150-TA1.50" Tube to 2.00" Tube Threaded Adapter24
HW-RT200-C3W2" Round Tube 3-way Corner Connector8
HW-RT200-S1802" Round Tube Straight Splicer24
RT150-55Aluminum Round Tube 55" Long12
RT200-452" Aluminum Round Tube 45" Long8
RT200-572" Aluminum Round Tube 57" Long28
Build order
- Build the top frame.
- Build the bottom frame.
- Add the vertical RT200 pieces.
- Add the RT150 mid posts.
- Square the frame and tighten every connection.
- Add graphics.