by SEG Warehouse
sales@whyseg.com

Build Sheet

19' × 19' × 6' H

QR code for the digital build sheet 19x19x6
Scan for digital build sheetReplacement graphics or missing parts? Scan here.

1 Parts to pull

SKUDescriptionQtyPulled
Tubes
RT150-67Aluminum Round Tube 67" Long · nominal 6′ support post12
RT200-452" Aluminum Round Tube 45" Long · nominal 4′ section8
RT200-572" Aluminum Round Tube 57" Long · nominal 5′ section24
RT200-692" Aluminum Round Tube 69" Long · nominal 6′ section4
Connectors
HW-RT150-TA1.50" Tube to 2.00" Tube Threaded Adapter24
HW-RT200-C3W2" Round Tube 3-way Corner Connector8
HW-RT200-S1802" Round Tube Straight Splicer24
Fasteners
HW-1420-0075-EB¼"-20 Eyebolt .75" Long4
HW-1420-0125-TS¼"-20 Thumb Screw 1.25" Long64
HW-1420-0150-FH¼"-20 Flat Head Screw 1.50" Long32
HW-1420-0250-BH¼"-20 Button Head Screw 2.50" Long12
HW-1420-0250-EB¼"-20 Eyebolt 2.50" Long12
HW-1420-BN¼"-20 Threaded Barrel Nut96

2 Frame

4′5′5′5′4′5′5′5′6′ RT20019′ per side6′1243

Swipe the drawing to see the full side.

19′ per side6′ high3 mid posts per side

3 Parts key

Corner connector: HW-RT200-C3W
1 Corner connectorHW-RT200-C3W · ×83-way corner piece
Straight splice: HW-RT200-S180
2 Straight spliceHW-RT200-S180 · ×24joins two RT200 tubes
Bottom support connection: HW-1420-0250-BH + HW-1420-BN · ×12
3 Bottom support connectionHW-1420-0250-BH + HW-1420-BN · ×12locks each mid post to the bottom rail
Tube adapter + mid post: RT150-67 ×12 · HW-RT150-TA ×24
4 Tube adapter + mid postRT150-67 ×12 · HW-RT150-TA ×24RT150 post with threaded tube adapters
RT200-454′ RT200RT200-575′ RT200RT150-676′ RT150 mid post

4 Build order

  1. Build the top frame.
  2. Build the bottom frame.
  3. Add the vertical RT200 pieces.
  4. Add the RT150 mid posts.
  5. Square the frame and tighten every connection.
  6. Add printed graphics/panels.