Build Sheet

12' × 12' × 5' H

QR code for the digital build sheet 12x12x5
Scan for digital build sheetReplacement graphics or missing parts? Scan here.

1 Parts to pull

SKUDescriptionQtyPulled
Tubes
RT150-55Aluminum Round Tube 55" Long · nominal 5′ support post4
RT200-572" Aluminum Round Tube 57" Long · nominal 5′ section4
RT200-692" Aluminum Round Tube 69" Long · nominal 6′ section16
Connectors
HW-RT150-TA1.50" Tube to 2.00" Tube Threaded Adapter8
HW-RT200-C3W2" Round Tube 3-way Corner Connector8
HW-RT200-S1802" Round Tube Straight Splicer8
Fasteners
HW-1420-0075-EB¼"-20 Eyebolt .75" Long4
HW-1420-0125-TS¼"-20 Thumb Screw 1.25" Long32
HW-1420-0150-FH¼"-20 Flat Head Screw 1.50" Long16
HW-1420-0250-BH¼"-20 Button Head Screw 2.50" Long4
HW-1420-0250-EB¼"-20 Eyebolt 2.50" Long4
HW-1420-BN¼"-20 Threaded Barrel Nut48

2 Frame

6′6′6′6′5′ RT20012′ per side5′1243

Swipe the drawing to see the full side.

12′ per side5′ high1 mid post per side

3 Parts key

Corner connector: HW-RT200-C3W
1 Corner connectorHW-RT200-C3W · ×83-way corner piece
Straight splice: HW-RT200-S180
2 Straight spliceHW-RT200-S180 · ×8joins two RT200 tubes
Bottom support connection: HW-1420-0250-BH + HW-1420-BN · ×4
3 Bottom support connectionHW-1420-0250-BH + HW-1420-BN · ×4locks each mid post to the bottom rail
Tube adapter + mid post: RT150-55 ×4 · HW-RT150-TA ×8
4 Tube adapter + mid postRT150-55 ×4 · HW-RT150-TA ×8RT150 post with threaded tube adapters
RT200-696′ RT200RT150-555′ RT150 mid post

4 Build order

  1. Build the top frame.
  2. Build the bottom frame.
  3. Add the vertical RT200 pieces.
  4. Add the RT150 mid posts.
  5. Square the frame and tighten every connection.
  6. Add printed graphics/panels.